U-Pave completed the full pavement structure installation, delivering a durable, high-performance asphalt surface built to specification. Our scope began at subgrade preparation and extended through granular base placement and multi-lift asphalt paving, resulting in a smooth, uniform, and traffic-ready finished surface.

All materials were supplied, placed, and compacted in compliance with project drawings and specifications to ensure structural integrity, proper load distribution, and long-term service life.

Scope of Work Summary

  • Subgrade scarification, conditioning, and compaction
  • Preparation of subgrade in accordance with engineered requirements
  • Supply and installation of non-woven geotextile separation fabric (Texel 060C or approved equivalent)
  • Supply, placement, and compaction of granular base course
  • Installation of asphalt base and surface courses to specified densities

Project Quantities at a Glance

Work Item Material / Description Thickness Area
Subgrade Preparation Scarify, condition, and compact 150 mm 2,326 m²
Geotextile Separation Non-woven geotextile fabric 2,326 m²
Granular Base Course 25-mm Granular Base 300 mm 2,326 m²
Asphalt Base Course 20-mm B Hot Mix Asphalt 150 mm 2,326 m²
Asphalt Surface Course 10-mm HT Hot Mix Asphalt 50 mm 2,326 m²

Result

A professionally constructed pavement system installed from subgrade through final lift, delivering long-term durability, consistent compaction, and a clean finished appearance—executed in full accordance with project specifications.

Legal Description: Lot 4; Block 5; Plan 3674NY
Nichols Project No. 25-084-DCD

Project Overview

Location

14404 - 128 Avenue NW, Edmonton, Alberta


Project Type

Full pavement structure installation


Client

Dream Summit Industrial (Alberta) LP General Contractor – Waiward Construction Management Inc.


Status

Substantial Completion (1-year Warranty in effect)