U-Pave completed the full pavement structure installation, delivering a durable, high-performance asphalt surface built to specification. Our scope began at subgrade preparation and extended through granular base placement and multi-lift asphalt paving, resulting in a smooth, uniform, and traffic-ready finished surface.
All materials were supplied, placed, and compacted in compliance with project drawings and specifications to ensure structural integrity, proper load distribution, and long-term service life.
Scope of Work Summary
- Subgrade scarification, conditioning, and compaction
- Preparation of subgrade in accordance with engineered requirements
- Supply and installation of non-woven geotextile separation fabric (Texel 060C or approved equivalent)
- Supply, placement, and compaction of granular base course
- Installation of asphalt base and surface courses to specified densities
Project Quantities at a Glance
| Work Item | Material / Description | Thickness | Area |
|---|---|---|---|
| Subgrade Preparation | Scarify, condition, and compact | 150 mm | 2,326 m² |
| Geotextile Separation | Non-woven geotextile fabric | — | 2,326 m² |
| Granular Base Course | 25-mm Granular Base | 300 mm | 2,326 m² |
| Asphalt Base Course | 20-mm B Hot Mix Asphalt | 150 mm | 2,326 m² |
| Asphalt Surface Course | 10-mm HT Hot Mix Asphalt | 50 mm | 2,326 m² |
Result
A professionally constructed pavement system installed from subgrade through final lift, delivering long-term durability, consistent compaction, and a clean finished appearance—executed in full accordance with project specifications.
Legal Description: Lot 4; Block 5; Plan 3674NY
Nichols Project No. 25-084-DCD
Project Overview
Location
14404 - 128 Avenue NW, Edmonton, Alberta
Project Type
Full pavement structure installation
Client
Dream Summit Industrial (Alberta) LP General Contractor – Waiward Construction Management Inc.
Status
Substantial Completion (1-year Warranty in effect)