U-Pave completed a full asphalt removal and repaving program, delivering a smooth, durable, and traffic-ready surface tailored for a high-use storage facility. The work included controlled saw-cutting at tie-in locations, removal of existing pavement, base restoration, and placement of a new commercial-grade asphalt surface designed for long-term performance.
All work was executed in accordance with project requirements, with a focus on clean transitions, proper compaction, and a consistent finished appearance across the site.
Scope of Work Summary
- Saw-cutting at designated asphalt tie-in locations
- Removal of existing asphalt pavement to design depth
- Loading, hauling, and off-site disposal of removed materials
- Supply, placement, and compaction of granular base course
- Application of emulsified asphalt bonding tack coat
- Supply, placement, and compaction of new asphalt surface course
- Final site reconciliation and cleanup
Project Quantities at a Glance
| Work Item | Material / Description | Average Thickness | Area |
|---|---|---|---|
| Asphalt Removal | Existing asphalt pavement | 275 mm | 4,575 m² |
| Granular Base Course | 20 mm Granular Base | 50 mm | 4,575 m² |
| Tack Coat | SS-1 Emulsified Asphalt | — | 4,575 m² |
| Asphalt Surface Course | Asphalt surface course (ACP) | 75 mm | 4,575 m² |
Result
A renewed asphalt surface delivering improved durability, smoothness, and long-term serviceability—completed with clean tie-ins, consistent compaction, and a professional finish suitable for commercial operations.
Legal Description: Plan 8722091 Blk 1 Lot 14A
Project Overview
Location
5403 136 Ave NW, Edmonton, AB T5A 4W1
Project Type
Full Asphalt Removal and Repaving Program
Client
Access Property Development
Status
Substantial Completion (1-year Warranty in effect)